Accurate generator capability in supplying Real and Reactive Power is crucial for system planning. The NERC MOD-025 Standard ensures the availability of precise information on both gross and net Real and Reactive Power capabilities of generators, as well as the Reactive Power capability of synchronous condensers, for planning models assessing Bulk Electric System (BES) reliability.
Download and read our white paper to gain insights into the fundamentals, compatibility, and compliance requirements of the NERC MOD-025 Standard.